Resident Inspector

Baker Hughes Pressure Control de Mexico S.A. de C.V.

Wellhead & Tree equipment PSL3G

On behalf of ADNOC for the ADMA LULU&SARB project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Inspection, Expediting & Witness

TechnipFMC, Stephenville TX USA

API 674 Reciprocating Pumps

On behalf of MCDERMOTT for the MIP Package 01 - Offshore GOSP-4 Development (BI -10 – 12201) project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Resident Inspector

VELAN INC, Montreal CANADA

P91 Valves

On behalf of SEPCO for the JIGCC Power Block (Package 4) project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Resident Inspector

IMI Critical Engineering, California USA

Choke Valves

On behalf of SNC LAVALIN on Saudi ARAMCO Inspection Requirements project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Inspection, Expediting & Witness

Schlumberger, Monterrey NL Mexico

Drilling materials

On behalf of ExxonMobil Development Company for the SAKHALIN-ORLAN-DHCE-RRAO180431 project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Resident Inspector

Tubacero S.A. de C.V., Monterrey NL Mexico

42” x 0.669” API 5L X70M PSL2

On behalf of IEPI MEXICO, S.A. DE C.V. for the LOS RAMONES PHASE II NORTE – NATURAL GAS TRANSPORTATION SYSTEM project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Resident Inspector

SNC Lavalin / Valerus, Houston TX USA

Gas Compressor Pkg & Process Skids

On behalf of SA KENTZ for the Northern Arabia Area Unconventional Gas (UG) Surface facilities System B (BI-36-01514) project

Performed activities were:

  • PIM

  • Production follow-up

  • Witness inspection (Raw Material, Tests, Coating, Dimensional, Packing)

Resident Inspector

CEESIowa High Flow Facility Iowa , Garner IA USA

Flow Meters

On behalf of IEPI MEXICO, S.A. DE C.V. for the LOS RAMONES PHASE II NORTE – NATURAL GAS TRANSPORTATION SYSTEM project

Performed activities were:

  • PIM

  • Setup & Calibration witness



  • Resident Inspector of Lattice Towers at COMEMSA / Abengoa, Guanajuato Mexico on behalf of Burns & McDonnell for the PSEG West project. Performed activities were: PIM, production follow up, galvanizing inspection, visual inspection, welding inspection, NDT witness, trial fit and packing.


  • Resident Inspector of Lattice Towers at SAE Towers, Monterrey N.L. on behalf of Burns & McDonnell for the PSEG West project. Performed activities were: PIM, production follow up, galvanizing inspection, visual inspection, welding inspection, NDT witness, trial fit and packing.


  • Inspection of Anchors at Sistemex, Queretaro on behalf of Techint for the Tuxpan Compressor Station project. Performed activities were: PIM, production follow up, galvanizing inspection, visual inspection, welding inspection, NDT witness, trial fit and packing.


  • Inspection of Blowers/Fans at Howden Buffalo Forge, Mexico City on behalf of Tecnicas Reunidas for the RUP Izmit Refinery Turkey project. Performed activities were: PIM, production follow up, visual inspection, welding inspection, NDT witness, LAB tests, trial fit and packing.


Also, on behalf of Fluor for the Lake Charles Chemicals project. Performed activities were: PIM, production follow up, visual inspection, welding inspection, NDT witness, LAB tests, trial fit and packing.


  • Inspection, Expediting & Witness of API pumps at Flowserve, Mexico City on behalf of Burns & McDonnell for the Devon / Bridgeport plant #7 expansion project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the OneOk/MB3 project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the Valero/Meraux Hydrocracker Upgrade project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the 67857 PMP03 ASN-01 project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the CVR Energy/MSAT Coffeville project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the LP/ETC Revolution Frac project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the Valero/C4 Alkylation project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of KBR for the Agrium Lone Star project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of MHI for the Lake Charles Chemicals project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of CB&I for the Flint Hills Amine Unit project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Fluor for the Sasol Chemicals (USA) LLCC project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Fluor for the s-450 SSO Column Sidedraw pump project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Techint for the Central Termoelectrica Pesqueria project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Technip for the Sasol LDPE project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection, Expediting & Witness of API pumps at SULZER, Mexico City on behalf of Burns & McDonnell for the OneOk/Fractinator Expansion project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Ford, Bacon & Davis LLC for the Phillips 66/Atmospheric Tower Improvements project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the OneOk/Spliter project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the OneOk/MB3 project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of DOW Chemical Co. for the DOW Freeport ARU-1050 project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Spectra Energy Westcoast for the DDP McMahon Gas Plant Taylor BC project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of MHI Compressor Int. Co. for the USGC Ethylene Project-1594 project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the OneOk/Bushton Depropanizer project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the P66 Billings VIP project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the Valero/Export Tanks to New Crude Unit project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Tecnicas Reunidas for the Aegean Refinery (STAR) project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Tecnicas Reunidas for the PETRONAS Rapid Project Package 3 project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of MHI for the CP-Chem USGC Ethylene project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Technip for the Sasol LDPE project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Phillips66 for the CDHDS Unit Revamp project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of JGC Corporation for the Bahrain Gas Plant-CGPIII project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of JGC Corporation for the Lock-A Gas Development Aceh project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Fluor for the Lake Charles Chemical project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of AMEC Foster Wheeler Energy LTD for the KNPC CFP MAA project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the Valero/Eagle Ford Crude project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the P66/Freeport LPG Export Terminal project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the Bradley Gas Plant project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of MHI for the MHI project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Phillips66 for the G-63 Replacement Santa Maria project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection, Expediting & Witness of pumps & valves at KSB, Mexico City on behalf of Techint for the 28 CC Norte II project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


on behalf of Techint for the Central Termoelectrica Pesqueria project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection, Expediting & Witness of pumps at ITT Goulds, Tizayuca on behalf of KBR for the LPO Debottleneck Bed project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Isolux Corsan for the MW CCPP project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the MSAT Wynnewood project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Tecnicas Reunidas for the NURC project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Inspection, Expediting & Witness of pumps at Ruhrpumpen, Monterrey N.L on behalf of Enbridge for the Eastern Access Edmonton project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Technip for the CP Chem Polyethylene project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Worley Parsons for the Shell/HOUMA project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


Inspection, Expediting & Witness of Valves at Velan, Canada on behalf of SEPCO for the ARAMCO project. Performed activities were: PMI, in process inspections to expedite, hydro test witness, performance test witness, impeller balance witness, paint inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection of forged rings at Frisa Forjados, Monterrey N.L. on behalf of Burns & McDonnell for the PPL Utilities / Susquehanna-Roseland Transmission project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing / Lab tests witness, machining review, NDT witness, document review, release and packing.


Also, on behalf of PW Power Systems for the PW project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing/Lab tests witness, machining review, NDT witness, document review, release and packing.


Also, on behalf of SHELL for the Coulomb Phase 2 project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing/Lab tests witness, machining review, NDT witness, document review, release and packing.


Also, on behalf of SHELL for the Perdido project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing/Lab tests witness, machining review, NDT witness, document review, release and packing.


Also, on behalf of Oil States for the OSI project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing/Lab tests witness, machining review, NDT witness, document review, release and packing.


Also, on behalf of EXXON for the Kizomba Satellites project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing/Lab tests witness, machining review, NDT witness, document review, release and packing.


Also, on behalf of Enbridge for the Walker Ridge Gathering System project. Performed activities were: PMI, Forging process witness, heat treatment witness, hardness witness, mechanical testing/Lab tests witness, machining review, NDT witness, document review, release and packing.


  • Witness of Packaged Chiller System at GUNTER, Monterrey N.L. on behalf of Burns & McDonnell for the Warren County Power Station project. Performed activities were: PMI, Leakage test witness.


  • Inspection, Expediting & Witness of Exhaust Silencers at Universal Silencer, San Luis Potosi on behalf of Solar Turbines Incorporated for the EAGLE-C project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.

Also, on behalf of Solar Turbines Incorporated for the APLNG-S project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the Chevron Bangladesh/CVX-B60 project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the Exxon Naftagas/EM-OD2 project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the HHI/MASAN project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the South Caucasus Pipeline Company/BP-SC project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the BP Exploration (Shah Deniz) LTD/BP-SD2 project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the Fluor Transworld Services Inc./XOM-ODT project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the Jemena Asset Mgmt. PL/JEM-MIC project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the Spectra Energy/SE-ENT project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Solar Turbines Incorporated for the Boardwalk Pipeline Partners/BWP project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection, Expediting & Witness of Exhaust Silencers at Braden, Monterrey N.L. on behalf of Pratt & Whitney for the Martinique project. Performed activities were: PMI, in process inspections to expedite, paint inspection, welding inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection & Witness of pressure vessels (Strippers & Separators) at Peco Facet, Queretaro on behalf of Burns & McDonnell for the Devon/Bridgeport Plant #7 expansion project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Consumer Energy for the Venture Tech project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Coga Peru for the Gasoducto Ayacucho project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Wood Group Mustang for the St Clair CS Upgrade project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of AOT Pipelines for the Ramones II - Norte project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.



  • Inspection & Witness of pressure vessels at Ricsa, Queretaro on behalf of DAELIM Industrial for the Petron RMP-2 project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of BE&K for the DUPONT project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of EXXON Mobil for the BTEC Low Cost Solution Polymerization Unit project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection & Witness of Distillation Trays at SULZER Chemtech, Mexico City on behalf of Tecnicas Reunidas for the Horizon Oil Sands VDU-DRU-HSU project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the Valero/Eagle Ford Crude project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of DOW Chemical Co. for the Distillation Column Base project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the P66/Billings VIP project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of KBR for the BP Husky Refining LLC project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the MPC Robinson Tier 3 project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


Also, on behalf of Burns & McDonnell for the ETC Revolution Frac. project. Performed activities were: PMI, Welding inspection, visual inspection, Trial fit, dimensional inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection & Witness of Heat Exchangers at Johnson Control, Durango on behalf of DOW Chemical Co. for the DOW Freeport ARU-1050 project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection & Witness of pressure vessels at Trinity Industries, Huehuetoca on behalf of Pan Ocean Corp for the Nigeria project. Performed activities were: PMI, heat treatment review, hydrostatic test witness, Welding inspection, visual inspection, paint inspection, dimensional inspection, final inspection, packing inspection and data book review and sign off.


  • Inspection, Expediting & Witness of MCC’s & Switchgears at SIEMENS, Queretaro on behalf of Athabasca Oil Sands for the AOSC Dover West Leduc Carbonate TAGD project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Trans Canada Keystone Pipeline Limited for the Keystone XL Oil Pipeline project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Tecnicas Reunidas for the Horizon Oil Sands VDU-DRU-HSU project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Canadian Natural for the CNRL Horizon forth Train 2 project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of KBR for the KBR-KOCH ENID UREA 2 EL 110 project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Ausenco for the PEMBINA Karr Tank Farm project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of PEMBINA for the ALGAR to Cheecham Lateral Expansion project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of PEMBINA for the Horizon Capacity Expansion Ph2/CLOVER Bar Junction project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of CB&I for the Freeport LNG Expansion LQF & PTF projects. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Zachry Industrial Inc for the FPL Port Everglades Combined Cycle Facility project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Worley Parsons for the Shell Houma project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Advantech for TVA Kingston FGD project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


  • Inspection, Expediting & Witness of MCC’s & Switchgears at ABB, San Luis Potosi on behalf of Snamprogetti Canada for the Sunrise Oil Sands CPF project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Ausenco for the PEMBINA Karr Tank Farm project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Technip for the SASOL/LCCP Ethane Cracker Unit 050 project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


  • Inspection, Expediting & Witness of Power Transformers at SIEMENS, Guanajuato on behalf of ENEL Green Power for the Sureste I Fase II Dominica project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


Also, on behalf of Technip for the Sasol LDPE project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


  • Inspection & Witness of Power Cable at CONDUMEX, Mexico City on behalf of Technip for the Total Petrocedeno/Main Station Upgrade project. Performed activities were: PMI, in process inspections to expedite, FAT witness and packing inspection.


  • Inspection & Witness of Foundries at Acerlan, Queretaro on behalf of Worley Parsons Canada for the Phase 2 Replacement Well Pad K project. Performed activities were: PMI, visual inspection, dimensional inspection, final inspection, NDT witness, packing inspection and data book review and sign off.


  • Inspection & Witness of Foundries at Fundidora Morelia, Morelia on behalf of Flowserve Netherlands for the 7000 KTA DCC project. Performed activities were: PMI, visual inspection, dimensional inspection, final inspection, NDT witness, packing inspection and data book review and sign off.


  • Inspection & Witness of Wire Rope at DEACERO, Queretaro on behalf of Worley Parsons Canada for the Geosciences Survey Alongshore Brazil Coast project. Performed activities were: LAB tests, final inspection, packing inspection and data book review and sign off.


  • Resident Inspector of 38”API 5L pipe at Tubesa, San Luis Potosi on behalf of Techint for the Ethane Pipeline project. Performed activities were: PIM, production follow u, visual inspection, welding inspection, NDT witness, FBE coating and shipping.


  • Resident Inspector of 42”API 5L pipe at TUBACERO, Monterrey N.L. on behalf of AOT for the Los Ramones Fase II Norte project. Performed activities were: PIM, production follow u, visual inspection, welding inspection, NDT witness, FBE coating and shipping.


  • UDAV-COMPERJ - Válvulas de TU (Consorcio SPE) Valves (Walworth Mexico): PIM, Vendor surveillance, Fabrication follow-up, NDT activities, Hydrostatic tests, Performance tests, Painting, Final inspection, Shipping inspection at Mexico City.


  • Rocky Reach (Chelan County PUD-USA) Outer Head Covers (Andrtiz Hydro Mexico): PIM, Vendor surveillance, Fabrication follow-up, Welding surveillance, NDT activities, Painting, Final inspection, Shipping inspection at Morelia.